2 x 500 MW NLC TAMILNADU POWER LIMITED -NTPL

[click to enlarge]

Panoramic View of NTPL

Installed capacity: 2 x 500 MW

  Fuel : Coal
  Coal Source :

70% Mahanadhi Coal

30% imported coal

 

CW System

:

Sea Water – closed loop system. Blow down to maintain water quality.

 

DM Water

:

Desalination Plant Output + Mixed Bed  Unit

 

Fresh Water

: Desalination Plant
 

Ash Disposal

:

Dry collection and Dry disposal

NTPL - Salient Features

[click to enlarge]

NTPL VIEW

 

Steam Generator

: Semi outdoor, balanced draft, assisted circulation, drum type, pulverized coal fired
 

Turbo Generator

:

Standard 3000RPM, tandem compound, single reheat, regenerative feed water heating

 

Generator

:

Hydrogen cooled.

 

Unit transformer

:

3 x 200 MVA, 21 KV / 400 KV

 

Switch Yard

:

Gas Insulated Switchgear (GIS).

 

Power Evacuation

:

At 400KV  by PGCIL

  Cooling Towers  

Natural Draft - Two Nos. –Height: 147.7 m

 

Chimney

 

One No. 275 m high, Bi-flue chimney

 

 

 

 

 

 

 

 

COD DETAILS

 

Unit - I

   COMPLETED ON 18.06.15

Unit - II
   COMPLETED ON 29.08.15

 

 


WHISTLEBLOWERS | DISCLAIMER | CONTACT US | NLC LTD

Registered office:“Neyveli House”, 1 st Floor,No 8 Mayor Sathiyamurthy Road, FSD,Egmore Complex of Food Corporation of India, Chetpet, Chennai - 600 031.
Copyright © 2012 NLC TamilNadu Power Limited All rights reserved. Best viewed in 1024x768 .